  • Natural Gas Heated Makeup Air Units: Control system renovation
  • Roofing repairs for 300,000 square foot building
  • Cooling Water and Compressed Air Mechanical Building: Construction for a metal processing facility, including installation of new cooling water and compressed air piping for the entire facility
  • Cooling System: Design and installation of parallel plate heat exchanger cooling water system for mold cooling tanks
  • Powerhouse Monitoring: Allen-Bradley PLC and Wonderware computer system for monitoring alarms for boilers, chillers, compressors, and switchgear. Included Scadalarm alpha-numeric paging system for Alarms
  • Emergency Backup Generator: Design, construction, and startup the generator and automatic transfer switch system for a computer software facility
  • Cooling Towers: Control system upgrades for water cooling towers at various facilities.